New House Progress

The bathtubs and shower stalls have been installed, along with water supply lines and drain pipes. There's only a little bit of siding left to do on the front. It looks like the roof is done, so interior work can proceed. The heating system installation has been started. More pictures have been added to the photo gallery.

Posted by Mike Newman at 12:40 AM